KOMA system offers you its premises in the complex in Prachatice. These spaces are after a systematic reconstruction. They represent our effort to create such a facility that is immediately usable and operational.
Production space is an important part of the building. There are 6 halls that are suitable for production, storage. These halls are almost identical according to their size. In all halls there is a new concrete floor with a floor load of 6,000 kg / m2. All halls have their direct exit gates to the outside loading area. Halls can be flexibly interconnected. There is a corridor for the passage of forklift trucks. This corridor is also connected with a loading ramp.
Each hall has a separate measurement of electricity and gas.
Hall 2 is equipped with hot-air units Robur. Hall 3 has a lowered ceiling and is also ready for food production. There is a space available for staff with lockers, kitchen and toilet.
Offices are also fully renovated, with 600 Mbit/s fiber optic Internet and optional fixed telephone line.
The availability of individual offices may vary over time and therefore we ask you to contact us. We will be glad to inform you about the current occupancy, price per square meter, service charges and other important details.